TTCTurkish Tower Cranes
Back to Products
TTC 378
Flat Top

TTC 378

Orta-büyük ölçekli inşaat projeleri, TOKİ toplu konut alanları ve fabrika inşaatları için ideal 20 tonluk flat-top kule vinç. Geniş çalışma yarıçapı ve yüksek verimliliği ile profesyonel projelerin vazgeçilmezi.

Technical Specifications

Capacity20 Ton
Radius80 m
Tip Load2.70 Ton
Free Standing67.6 m

Detailed Load Chart

Official Catalog Data

Our engineers are ready to determine the most accurate configuration according to your project's wind load, ground survey, and building structure. The data below is for standard installations.

BoomFallR(Cmax)Cmax20253035404550556065707580
80m
142013.4610.48.366.915.824.974.293.743.272.882.552.262
27.41010109.067.616.525.674.994.443.973.583.252.962.7
75m
16.82016.4812.810.358.67.296.275.454.784.233.753.353
32.8101010109.37.996.976.155.484.934.454.053.7
70m
17.52017.2413.3910.8397.626.555.754.423.923.5
34101010109.78.327.256.45.75.124.624.2
65m
182017.813.8411.29.327.916.815.935.214.614.1
3510101010108.617.516.635.915.314.8
60m
192018.914.711.998.47.236.35.544.9
36.810101010109.17.9376.245.6
55m
19.22019.1214.912.0910.088.587.46.475.7
37.410101010109.288.17.176.4
50m
20202015.6312.7210.649.087.876.9
39.210101010109.788.577.6
45m
20202015.7112.7110.568.957.7
38.810101010109.658.4
40m
20.3202015.7912.7710.629
3910101010109.7
35m
20.4202015.8412.7810.6
351010101010
30m
20.420201212
30101015.7912.7
2-Fall - Less load, faster speed
4-Fall - More load, slower speed (Heavy Duty)
8-Fall - Maximum load capacity

Jib Configuration

Counter Jib23m
Max Jib81.3m
Segments10

Segment Configurations

23m
10m
1
10m
2
10m
3
10m
4
10m
5
5m
6
10m
7
5m
8
5m
9
5m
10
81.3m
1
2
3
4
5
6
7
8
9
10
80m
1
2
3
4
5
6
7
8
9
75m
1
2
3
4
5
6
7
8
10
70m
1
2
3
4
5
6
7
8
65m
1
2
3
4
5
6
7
9
60m
1
2
3
4
5
6
7
55m
1
2
3
4
5
6
50m
1
2
3
4
5
45m
1
2
3
4
6
40m
1
3
4
6
35m
1
4
6
30m
Mast Heights (L2.0m / L69B1 / L69B2):
Lv1:12m
Lv2:15m
Lv3:18m
Lv4:21m
Lv5:24m
Lv6:27m
...+14
60m: L2.0M: 67.6m / L69B1: 67.6m
Used Segment
Unused Segment

Mechanism Specifications (20t)

NameModelSpeed 1Load 1Speed 2Load 2Motor
Hoisting75JLF500-1001.5t0-2120t75
Trolleying11JXF100-65m/min---11
SlewingRVF7.50-0.7rpm---7.5x3
Power: 380v (±10%)/50Hz
Total: 75JLF50:108.5kw

Counter Weight

HeightSlabWeightTiePHZ3500PHZ1300PHZ600
80m2326400KG7111
75m2326400KG71/1
70m2325800KG71/1
65m2325800KG71/1
60m2325800KG71/1
55m2324600KG61/1
50m2324000KG61//
45m2321600KG6/1/
40m2319400KG611/
35m1821200KG5/11
30m1819400KG511/

Mast Sections (L2.0m / L69B1 / L69B2)

Lv112m
Lv215m
Lv318m
Lv421m
Lv524m
Lv627m
Lv730m
Lv833m
Lv936m
Lv1039m
Lv1142m
Lv1245m
Lv1348m
Lv1451m
Lv1554m
Lv1657m
Lv1760m
Lv1863m
Lv1966m
Lv2067.6m
Foundation Weights (ton)
F2: 157t / 170t
F3: 153t / 150t

Anchorage Information

MastL69B1
A51.6m
B36m
C46.6m
H (Max)246.6m

TTC 378

Contact us for detailed technical information, pricing and the right configuration for your project.

WhatsApp Hattı